4. Drill 1/4-inch pilot holes through top of each leg and through ceiling joists. Attach supports to joists with 1 1/2-inch lag screws. On finished ceilings, attach 2 × 4 ceiling plates to ceiling, then attach lumber rack supports to the ceiling plates.